Roads are a record of those who have gone before.
Highways In India
India has the second-largest road network within the world, spanning a complete of 5.89 million kilometers (km). This road network transports 64.5% of all goods within the country and 90% of India’s total passenger traffic uses the road networks to commute. Road transportation has gradually increased over the years with improvement in connectivity between cities, towns, and villages within the country.
Our Contribution
Highways are considered as the arteries of a nation. Our growth and development is dependent upon them. KCC Buildcon Pvt. Ltd. has been an active partner in our country’s growth for the last two decades and we will continue to do so with our rich experience. We contribute in Indian govt. infrastructure moments like –
- BHARATMALA PROJECT
- WESTERN-PERIPHERAL EXPRESSWAY
Bharatmala Pariyojana (Package-6) Rajasthan
Chiloda -To- Naroda
NH-8 , Gujarat
Talgaon -To- Kalmath Project
(Maharashtra)
Barasat -To-Krishnagar (W.B)
Watul to Talgaon section of NH-17 (Maharashtra)
Development of Access controlled Kundli-Manesar-Palwal Expressway Section (Manesar RD 83.320 Km to Palwal RD 135.650 Km (Balance Work) on Item Rate mode.
Project Details:-
HSIIDC
464.39 Crore
Haryana
Rehabilitation and up-gradation of NH-66 (Erstwhile NH-17) from Km 367/200 to Km 406/030 [Talgaon to Kalmath section] to Four lane with paved shoulder in the state of Maharashtra under NHDP –IV on Hybrid Annuity Mode.
Project Details:-
MoRTH
380 Crore
Maharashtra
Balance work for construction of 4 laning of Barasat Krishnagar section of NH- 34 from km 48.533 to km 115.272 (length 66.72 km) pertaining to Nadia District in the state of West Bengal on EPC Mode.
Project Details:-
NHAI
1183.00 Crore
West Bengal
Rehabilitation and upgradation of Watul to Talgaon section of NH-17 [New NH no. 66] from existing km 332/200 to km 367/200 [design km 165+270 to km 198+528] in the State of Maharashtra to four-lanes with paved shoulders on EPC Mode under NHDP-IV.
Project Details:-
MoRTH
508.00 Crore
Maharashtra
Construction of 8-Lane Carriageway starting near Junction at SH44 to Junction with Keshopura Road (Km 115.700 to Km 151.840) section of Delhi-Vadodara Greenfield Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in Rajasthan.
Project Details:-
NHAI
947.00 Crore
Rajasthan
Construction of Eight Lane Carriageway starting at Junction with Keshopura Road to Junction with NH-11 (Km 151.840 to Km 183.000) section of Delhi-Vadodara Green field Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in Rajasthan.
Project Details:-
NHAI
931.00 Crore
Rajasthan
Construction of Widening to 4 Lane Configuration of Champadanga – Pursura – Arambagh Road Section of SH-2, in the District of Hooghly in West Bengal, Phase-I Proposal from 0.00 km to 11.90 km and 15.20 km to 19.626 km (Total Length 16.326 km Excluding Muthadanga Bypass) through an Engineering, Procurement and Construction.
Project Details:-
WBHDC
427.11 Crore
West Bengal
Construction of Six Laning from existing Km 494.410 (Design Chainage 540.595) to existing Km 509.550 (Design Chainage 555.905) of NH-8 in the State of Gujarat (Length 15.310 Km) on EP.